Plot 4, Shipston Business Village

After successfully completing the development of 14,000 sq/ft of industrial units on this site, we were commissioned to obtain planning permission to develop a further 17,000 sq/ft of B1, B2 and B8 offices and warehousing.

​

After completion of a successful planning process, work commenced on the engineering phase of the project. This included producing working construction drawings along with all the relevant structural designs and calculations.

​

Upon approval of all construction drawings and the pre-construction phase, work commenced on site.

​

The key phases of the project were: -

  • Site survey and trial bore holes to check ground conditions and bearing capacity and limitations

  • Detailed site survey, carried out in house by Key Projects

  • Site strip and preparation including all development of levels

  • Foundations

  • Steel Erection

  • Cladding and external shell

  • Groundworks including all drainage, attenuation, ducting for utility services

  • Internal floors

  • Laying concrete and tarmac to create the external yard and parking area

  • Landscaping

​

On completion of the site work all necessary paperwork for commissioning was issued along with warranties for all the completed units

​

The project was successfully completed in under six months, but we were promptly commissioned by several purchasers to fit-out their units. Various levels of finish were achieved, from simple office and toilet facilities to a complete office spec including all Mechanical and Electrical installation. In particular, one unit required the removing of the roller shutter door and the installation of a full height glazed screen.